A Groundwork company - serving Enterprise, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Las Vegas, NV

Garage Conversion ADU in Las Vegas - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Las Vegas: What It Costs and How Long It Takes

A garage conversion ADU in Las Vegas typically runs $45,000 – $130,000 and takes 4 – 7 months from permit submittal to final inspection. The job turns an attached or detached garage into a legal, permitted living unit: insulation, HVAC, plumbing, electrical, a kitchenette and bath, finished walls and floors. Most single-bay and two-bay garages in the valley land between 400 and 600 square feet, which keeps many projects near the lower half of that range. Call (844) 797-4406 and we’ll walk your garage, check the existing slab and service panel, and give you a written line-item estimate.

Call (844) 797-4406

A single-story rear room addition with tall windows and a new patio

No two garages here are alike, but the sequence is consistent. Here’s what actually happens, stage by stage, and what you’ll be deciding along the way.

Stage 1: Feasibility and design (2 – 4 weeks)

We start with your garage’s real constraints: slab condition, ceiling height, the location of the main electrical panel, and whether the driveway can still serve parking if you lose the bay. You’ll decide the unit’s layout (studio versus one-bedroom), whether the entry faces the side yard or the driveway, and how much of the garage door opening stays. In Las Vegas’s older northwest subdivisions, a garage door that becomes a wall is often the cleanest exterior move; in newer master-planned areas, the design review committee may push you toward keeping the door as a window wall or a framed faux-door facade. This decision drives everything downstream, so it comes first.

Stage 2: Permits and plan check (3 – 8 weeks)

Permits get pulled before a single board is cut. Your plans go through plan check with the jurisdiction, and review time depends heavily on how complete the submittal is. We handle the submittal, respond to reviewer comments, and won’t schedule demo until the permit is in hand. You’ll decide the inspection schedule windows and confirm any HOA architectural approval you need alongside the permit.

Stage 3: Demo, prep, and rough-in (3 – 5 weeks)

This is the heavy phase. The garage door opening gets framed and closed, the slab gets assessed and patched or topped where it’s cracked or out of level, and the electrical service gets evaluated for capacity. Then comes framing for the new bath and kitchenette walls, plumbing rough-in, HVAC, insulation, and the first round of inspections. You’ll pick fixtures and finishes during this window so nothing stalls at the back end.

Stage 4: Finishes (4 – 6 weeks)

Drywall, texture, paint, flooring, cabinets, countertops, tile, trim, and the mechanical trim-out all land here. You’ll make your finish selections (flooring, cabinet fronts, countertop material, tile) as early as Stage 2 if you want to compress the schedule.

Stage 5: Final inspections and handoff (1 – 2 weeks)

Final building, electrical, plumbing, and mechanical inspections, then a punch walk with you. This entire conversion is part of a full Home Additions & ADU in Las Vegas scope when you also want to touch the main house, and we coordinate the two so the utility work isn’t done twice.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make Before and During the Build

A garage conversion ADU is mostly a series of specification calls. Here are the ones that matter most, with the honest trade-off on each.

  • Framed wall versus retaining the garage door. Framing the door opening into a solid wall gives you a fully insulated, interior-grade envelope and better thermal control; it costs the least on the envelope side but changes the street face of the house. Keeping the door as a facade with a window inset looks familiar from the curb and suits HOA review, but costs more to build and weatherproof.
  • Flooring over slab. Luxury vinyl plank handles slab moisture swings and desert heat better than most options and stays in budget. Engineered hardwood feels warmer underfoot but costs more and wants tighter humidity control. Polished or stained concrete is nearly indestructible in this climate and inexpensive over the long run, but it’s cold in the winter and unforgiving of subfloor imperfections.
  • Mini-split versus extending the central system. A dedicated mini-split is often the smart call for a converted garage in Las Vegas: it zones the unit separately, handles the 110°F-plus summers, and doesn’t force your main HVAC to carry the extra load. Tying into the existing central system can work if the equipment has spare capacity, and it costs less up front, but it strains an aging air handler and couples the ADU’s comfort to the main house.
  • Kitchenette versus full kitchen. A sink, a two-burner cooktop, a compact fridge, and a microwave is a kitchenette and usually clears the code bar for an ADU without a full appliance suite. A full kitchen adds range, venting, and load, which raises cost. If it’s rental you’re after, a kitchenette covers most tenants.
  • Hot water. A dedicated tankless unit avoids long hot-water runs from the main water heater and frees floor space; a small tank heater costs less up front. For a detached garage, the tankless is usually worth the extra money.
  • Prefab versus site-built. True prefab pieces (Cover, Dvele, Mighty Buildings, Boxabl) are worth pricing alongside stick-built, but they don’t escape the same permitting, foundation, and utility-connection work. Get both numbers before you commit.

What Garage Conversion ADU Costs in Las Vegas, NV

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a completed, permitted garage conversion ADU in Las Vegas. Where a project lands in that band depends on five variables:

  • Size and existing condition. A clean 400-square-foot two-car garage with an intact slab sits near the low end. A cracked, out-of-level slab, a low ceiling, or a service panel that needs upgrading pushes you up.
  • Moving or adding utility runs. Relocating the main water heater, adding a second bath, or pulling a new electrical service all add cost. Keeping the new bath close to existing plumbing lines is one of the cheapest decisions you can make.
  • Ceiling and structural work. Raising a low garage ceiling, reinforcing trusses, or adding a header to open the space adds structural scope that shows up in the bid.
  • Material grade. Builder-grade finishes versus tile, engineered flooring, and solid-surface countertops can swing the finish budget by tens of thousands.
  • Permit and inspection scope. A straightforward code-compliant unit is one thing; a design that triggers plan-check comments or a design review process adds time and cost.

Your written estimate will list framing, insulation, HVAC, electrical, plumbing, drywall, finishes, and permit fees as separate line items. Items that typically sit outside a base conversion quote: landscape restoration, driveway removal or replacement where the parking bay is lost, and any design-review fees your HOA charges. Full Home Additions & ADU projects get the same itemized, upfront-pricing treatment so the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Las Vegas Homes Specifically Do to This Job

Las Vegas garages are built for cars, not people, and the local conditions sharpen that. The valley’s extreme desert heat cycling and relentless sun hit slab-on-grade foundations and wood framing hard, so almost every job here is about thermal expansion, UV degradation, and moisture-driven soil movement rather than freeze-thaw damage. In the northwest valley, expansive clay soils that swell and shrink with irrigation and rare rain are notorious for hairline cracks and slab movement, and a home’s irrigation habits often predict where the slab has shifted. That matters because the slab is the first thing your ADU floor sits on; we check it before we quote. The valley’s rapid, decades-long buildout also means we routinely work on 1990s-era subdivisions and brand-new master-planned communities in the same week, and the permit and inspection approach reflects which one you’re in. If your garage sits next to a driveway you’re reconfiguring, homeowners often pair this with Concrete Driveways & Concrete Work in Las Vegas or, for a driveway that’s hard-surfaced, with Asphalt Driveways & Resurfacing in Las Vegas. We handle these conversions across Las Vegas, including the northwest and north valley ZIPs.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Las Vegas

A stone counter, tile backsplash and open shelf after a kitchen remodel

Get a Free Estimate for Your Garage Conversion ADU in Las Vegas

A garage conversion ADU is a serious project with real numbers attached, and you should price it before you commit to anything. We’ll come to your property, assess the slab, ceiling, and service panel, and hand you a written line-item estimate with no surprises. Call (844) 797-4406, a live person answers 24/7, and we’ll set up your free on-site estimate and design consult.

Written by the team at Groundwork Construction Co.

Why Las Vegas Chooses Groundwork Construction Co. of Enterprise

We set the standard for garage conversion ADU in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seat

More services in Las Vegas

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(844) 797-4406

Request a Free Estimate in Las Vegas

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch