Garage Conversion ADU in Sunrise Manor: What It Costs and What It Takes
A garage conversion ADU in Sunrise Manor runs $45,000 to $130,000 and takes roughly 4 to 7 months from permit to final inspection. Most 89110 garages are single-car or two-car slabs of 240 to 480 square feet, and the county permit is the long pole in the tent, not the framing. That price covers the conversion itself: insulation, drywall, flooring, a bathroom, a kitchenette, HVAC, and electrical brought up to code. Call (844) 797-4406 and we’ll walk your garage and give you a written line-item number.
How a garage conversion ADU comes together, stage by stage

Every conversion is different, but the sequence in Sunrise Manor is consistent. Here’s the order we work in and where you make decisions.
Stage 1: Feasibility and design (2 to 4 weeks). We measure the garage, check the slab, look at the existing electrical panel, and figure out where the new drain lines will run. You decide room layout here – one open studio or a divided bedroom-and-living arrangement. Clark County wants to see a site plan and floor plan with the application, so this stage produces both.
Stage 2: Permitting through Clark County (4 to 10 weeks). Because Sunrise Manor is unincorporated, there’s no city counter to walk into. Everything routes through the Clark County Building Department, and plan review turnaround depends on how clean the submittal is. If the garage or an attached structure was built without permits, we have to resolve that on paper before the conversion can be approved. We pull the permit and handle the review correspondence.
Stage 3: Demo and rough-in (2 to 4 weeks). The garage door comes out and gets framed and sheathed. The slab gets evaluated – if it’s cracked or under-slab plumbing needs to move, that’s day one through day five. We run new electrical, plumbing, and HVAC, then the county inspects rough framing, electrical, plumbing, and mechanical before any drywall goes up. You decide fixture locations and rough-in points before this stage closes.
Stage 4: Insulation, drywall, and finishes (4 to 7 weeks). Spray foam or batt insulation goes in, drywall gets hung and taped, and the room takes shape. Flooring, cabinets, countertops, bathroom tile, and paint all land here. This is where your material choices get spent.
Stage 5: Final inspections and punch (1 to 2 weeks). Final building, electrical, plumbing, and mechanical inspections, then a walkthrough with you. Anything not right gets corrected under the 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between
Conversions are mostly a set of trade-offs between cost, durability, and how the room will live. These are the choices that matter in a Sunrise Manor garage.
- Bathroom rough-in: slab-trench vs. raised floor. Trenching the slab for a new drain is the cleanest finished look and adds $3,000 to $6,000 over a raised platform, but requires more slab repair. A raised floor is cheaper up front and easier to reverse, though it eats headroom.
- HVAC: extend the house system vs. mini-split. Extending the existing system is often cheaper if the panel and ductwork can carry the added load. A dedicated mini-split runs $3,500 to $6,000 installed and gives the tenant their own thermostat. In a Sunrise Manor summer, oversizing the cooling is not a mistake.
- Garage door opening: wall it in vs. keep it as a window wall. Framing and sheathing the opening is standard. Keeping the opening with glazed panels gives the room light but needs heat-rated glass and extra structural care.
- Flooring: LVP vs. tile vs. polished concrete. Luxury vinyl plank is the value pick and handles desert dust well. Porcelain tile in the wet areas is worth it. The existing slab can be polished and sealed if it’s sound and level, which saves money.
- Insulation: batt vs. spray foam. Spray foam seals the garage-to-house boundary better and is the right call on older scabbed-on construction. Batt is cheaper and works fine when the walls are tight.
- Exterior: stucco patch vs. full re-stucco. A clean patch matches the existing finish for far less. If the surrounding stucco is cracked and delaminating, re-stucco that wall while the scaffold is up.
What Garage Conversion ADU costs in Sunrise Manor, NV

The number lands between $45,000 and $130,000 for most 89110 garages. That’s the full conversion, not a stripped-down shell. Five things push a project toward the low or high end:
- Garage size. A 240-square-foot single-car converts at the low end. A 480-square-foot two-car with a full kitchenette lands at the top of the range.
- Slab and structure condition. A cracked slab, settling, or unpermitted framing from a past owner adds demo, repair, and possibly engineering review.
- Moving plumbing. Adding a bathroom where there was no drain line is the single biggest cost swing. Keeping fixtures near existing drain paths keeps the number down.
- Electrical panel capacity. An older 100-amp panel that can’t carry a kitchenette and mini-split may need an upgrade, which is a separate line item.
- Finish grade. Standard LVP and stock cabinets versus tile throughout and custom millwork is a $20,000 swing on the same footprint.
Every written estimate breaks out framing, insulation, drywall, electrical, plumbing, HVAC, flooring, cabinetry, fixtures, permits, and labor as separate line items. No lump-sum guessing. What typically isn’t included: major structural repair uncovered behind the walls, foundation work beyond slab patching, and landscaping or driveway repair after the work. This is the same transparent pricing we use across our Home Additions & ADU service, and it’s part of why the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Sunrise Manor homes specifically do to this job
Sunrise Manor’s housing stock changes the math. Most of the garages we open are attached to 1960s through 1980s single-story stucco-on-slab tract homes, and a fair share have carports enclosed or garages extended without a permit. Open the walls and you find the evidence: undersized framing, ungrounded wiring, a slab that’s settled. Because the township is unincorporated, all of that has to be resolved through Clark County inspections, and legalizing an unpermitted space often means opening more of the structure than a simple conversion would. We plan for retro-permitting at the front of the job, not as a surprise.
Climate plays into it too. Sunrise Manor sits on the east side at roughly 1,800 to 2,000 feet, and summer highs top 105°F with intense UV. A garage that’s been a passive solar oven for 40 years needs real insulation and oversized cooling, or the ADU will never hold temperature. Monsoon-season rain in July through September and the occasional winter freeze mean the new exterior wall needs proper flashing and drainage grading. We cover all of Sunrise Manor and use the same crew standards across the township – you can see how we work on the Sunrise Manor service-area page.
If the conversion is part of a larger plan, say a room addition or a full rehab of the house, that wider scope falls under Home Additions & ADU in Sunrise Manor. Homeowners often pair a garage conversion with updated parking and access, which is where Concrete Driveways & Concrete Work in Sunrise Manor or a new Asphalt Driveways & Resurfacing in Sunrise Manor surface comes in after the garage door comes out.
Serving Sunrise Manor, NV – Our Local Coverage Area
We serve Sunrise Manor and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Garage Conversion ADU in Sunrise Manor

Plan on 4 to 7 months from signed contract to final inspection. Permitting through Clark County is the longest stage at 4 to 10 weeks, and build time runs 7 to 13 weeks after that. If an existing unpermitted structure needs legalization, add 2 to 4 weeks. Call (844) 797-4406 for a timeline built around your specific garage.
Yes. Any habitable conversion in 89110 requires a Clark County building permit, and the work gets inspected at rough framing, electrical, plumbing, mechanical, and final. Converting a garage without a permit is a resale problem and an insurance problem later. We pull the permit and handle the inspections.
Sometimes. A studio with a half-bath positioned near the garage’s existing drain path keeps the structural and plumbing work minimal. A full kitchenette with a shower and sink almost always means trenching the slab and adding drain lines. We’ll tell you which category your garage falls into after a walkthrough.
Most conversions land between $45,000 and $130,000, driven by garage size, slab condition, plumbing relocation, panel capacity, and finish grade. A basic single-car studio sits at the low end; a full two-car ADU with a kitchenette and upgraded finishes sits at the high end. Call (844) 797-4406 and we’ll give you a written line-item estimate at no charge.
Every garage conversion we build is backed by the 730-Day Done Right Promise. If something isn’t done right, we make it right, for two years after the final walkthrough. That’s the longest workmanship guarantee we offer on residential work, and it applies to the conversion regardless of who’s living in it.
Get a free estimate for your Sunrise Manor garage conversion
Converting a garage into an ADU is a real construction project with real permit requirements, and it deserves a real number. We’ll come out, measure the garage, check the slab and panel, and put together a written line-item estimate with the Clark County permit steps mapped out. The visit is free and the estimate is free, with 0% financing for 18 months available and $1,000 off on projects over $10,000. Call (844) 797-4406 – a live person answers, day or night.