







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterVanities, Tile & Fixtures in Enterprise, NV
New vanities, tile and fixtures are the three upgrades that change a bathroom the most for the money, and in Enterprise they usually come as a set. A dated vanity with a failing faucet, shower tile with cracked grout, and builder-grade fixtures that were never meant to last 20 years in our hard water are the reasons homeowners here call us. We’re Groundwork Construction Co. of Enterprise, and we handle the whole swap, from tear-out to the last bead of silicone, under a 730-Day Done Right Promise that covers the workmanship long after we’ve packed up. You can reach a live person any hour of the day at (844) 797-4406 and get a free estimate before you commit to anything.
Most of these jobs sit inside a larger Bathroom Remodeling in Enterprise, but plenty of homeowners just want the vanity, tile and fixtures refreshed without touching the tub or layout. That’s the sweet spot for our Bathroom Remodeling team: a defined scope, upfront pricing, and a crew that finishes when it says it will. We’ve been in business since 2014, our technicians bring up to 12 years of experience, and we work with brand partners like Kohler and Cambria so what goes in your bathroom is chosen for how it holds up in the desert, not just what’s on the shelf.
If you’ve priced this work before and gotten a vague number that ballooned by the end, that’s exactly what we built this page to fix. The number you see is the number you pay.
What “Vanities, Tile & Fixtures” Actually Covers
It helps to know what’s in scope, because the term gets used loosely:
- Vanities – the cabinet, top, sink and faucet, whether you keep the plumbing where it is or move it a few feet.
- Tile – shower walls, tub surrounds, the floor, sometimes a backsplash, plus the waterproofing underneath that most homeowners never see but that decides whether the job lasts.
- Fixtures – faucets, shower heads, valves, drains, towel bars, and lighting trim. The small metal pieces that make a bathroom feel finished or feel cheap.
The work lives under the bathroom remodeling umbrella because tile and fixtures almost always touch waterproofing, and waterproofing is where bathrooms either hold up or fail.

When You Need Vanities, Tile & Fixtures
These are the situations we hear about most from homeowners across Enterprise. If any of these sound familiar, it’s usually worth a conversation before a small problem turns into a weekend killer.
- Your vanity is swelling or soft at the base. Particleboard cabinets absorb moisture over time, especially in bathrooms with a shower and no ceiling fan running long enough. If the toe kick or side panel feels spongy, the cabinet is past saving and it’s time for a replacement, not a coat of paint.
- The shower tile has cracked or the grout is crumbling. Enterprise sits in a hard-water area, and mineral buildup plus thermal movement from our hot summers works grout loose. Once water gets behind the tile, the backing board starts to go, and a cosmetic fix won’t stop it.
- Your fixtures are original builder grade. If the faucets and shower valve came with the house and the house is 15-plus years old, the cartridges and valves are near the end of their service life. Replacing them now beats a mid-shower valve failure that soaks the wall.
- You’re freshening up a bathroom before selling or renting. A clean vanity, new tile and matching fixtures is one of the highest-return cosmetic updates a bathroom can get, and it photographs well for listings.
- You want the layout to work better. A slightly wider vanity, a taller faucet, a shower niche, a bench in the shower. Small changes that make a daily routine easier and get easier to do while the tile is already coming out.
- The tile pattern or color is stuck in another decade. Pink and beige 4-inch squares still show up in homes across Enterprise, and swapping the surface is the whole point of the job for many of our customers.
If your situation is bigger than tile and fixtures, say, the tub has to go or the room needs re-plumbing, the full bathroom remodel service is the better starting point.
Our Vanities, Tile & Fixtures Process
Here’s how a project runs from first call to final walkthrough. Most vanities, tile and fixtures jobs are done in a handful of visits, and we tell you the schedule before we start, not after.
- Free estimate and design consult. We measure the room, look at what’s behind the existing tile if it’s already coming out, and talk through materials and budget. You get a clear, itemized number before any demolition starts.
- Material selection and order. We help you pick the vanity, tile and fixtures from our brand partners, confirm lead times, and lock the schedule to when the materials actually land. Nothing worse than a stalled job waiting on a backordered faucet.
- Demo and site protection. We cover floors and hallways, shut off and protect plumbing, and pull the old vanity, tile and fixtures out cleanly. Dust control matters in a house people are living in.
- Rough-in and waterproofing. If the faucet or valve locations are moving, the plumbing rough-in happens now. Then the critical part: proper backer board and a waterproofing membrane behind the tile. This is the step cheap jobs skip, and it’s the one that decides whether the job holds up in Enterprise’s climate.
- Tile setting, grout and sealing. We set the tile, grout, and seal where needed, with the layout and spacing you approved. Vanity goes in, fixtures get installed, and the room gets dialed in.
- Walkthrough and sign-off. We walk the finished room with you, test every fixture, and hand over the care notes. The 730-Day Done Right Promise starts here, and if anything’s off, we make it right.
Background-checked, uniformed technicians show up on every visit. No unmarked vans, no rotating strangers. That consistency is part of why our customers refer us to neighbors.
Why Waterproofing Is the Whole Ballgame in Enterprise
You can set gorgeous tile and still fail the job in a year if the waterproofing underneath is wrong. Enterprise’s dry heat and heavily mineralized water put bathrooms through a specific cycle: moisture from daily showers, then rapid drying, then a repeat. Grout and caulk flex with that cycle, and heat pushes tile and cabinet joints harder than in a mild climate. The membrane behind the tile and a properly sloped shower pan are what keep water from finding a path into the wall cavity. When we quote a tile job, the waterproofing is a line item, not a shortcut. If a bid you get doesn’t mention it, ask what’s going behind the tile. It’s the single most important question you can ask a contractor.
This same attention carries into the other trades we handle, so a bathroom refresh can be timed around a roof replacement or new windows if you’re planning multiple projects. Our roofing work and windows and doors teams pull from the same standards and the same guarantee.

Vanities, Tile & Fixtures Pricing in Enterprise
Here’s the honest range. Actual cost depends on the size of the bathroom, the materials you choose, and whether the plumbing layout changes. Your free estimate pins it down for your specific room.
| Item | Typical Range | What Moves the Number |
|---|---|---|
| Vanity replacement (cabinet, top, sink, faucet) | $700 – $2,400 installed | Standard vs. custom size, stone vs. quartz top, single vs. double sink |
| Shower or tub surround tile | $1,800 – $5,500 installed | Tile size and material, niche or bench, waterproofing scope |
| Bathroom floor tile | $900 – $2,800 installed | Square footage, tile type, subfloor prep |
| Fixtures (faucets, shower head, valve, drains, trim) | $400 – $1,600 installed | Brand tier, number of pieces, valve replacement vs. trim-only |
| Full vanity + tile + fixtures package | $4,500 – $12,000 installed | Overall scope, materials chosen, any plumbing relocation |
Two things ease the budget. First, we do upfront pricing, no surprises: the number on the estimate is the number you pay unless you change the scope yourself. Second, we offer 0% financing for 18 months and $1,000 off projects over $10,000, and the estimate and design consult are always free. If a bid comes in far below these ranges, ask what’s being left out, because waterproofing and proper fixtures aren’t optional. Call (844) 797-4406 for your exact quote.
What Pushes a Vanities, Tile & Fixtures Job Up or Down
- Tile choice. Large-format porcelain and standard ceramic keep labor down. Natural stone and small mosaic patterns cost more to set and seal.
- Plumbing moves. Keeping the vanity, sink and shower valve where they are is cheaper. Relocating a drain or extending a water line adds labor and inspection.
- What’s behind the old tile. We can’t always know until demo. If the old backing is failing, the new waterproofing costs a bit more but prevents a repair later.
- Fixture brand tier. Standard-grade fixtures (we work with Kohler and others) hit a sweet spot on price and durability. High-end trim costs more but lasts.
- Room size and vanity configuration. A small hall bath and a primary suite are different jobs even if they sound similar.
How Long Does a Vanities, Tile & Fixtures Project Take?
Vanity-only swaps are often done in a single visit. Shower and floor tile typically runs a few days to a week depending on square footage and drying time between steps. Grout and waterproofing need cure time that you can’t rush, and we build that into the schedule upfront so there are no surprise delays. We confirm your start and completion dates in writing before demo day.
Materials We Work With
We keep a curated set of brand partners rather than offering everything on the market, because the bathroom is not the place to gamble on unfamiliar brands. Kohler for fixtures is a common pick, quartz and stone for vanity tops, and porcelain or ceramic for tile walls and floors. In the newer prefab and modular bathroom space, brands like Cover and Dvele are making waves, and while most of our Enterprise clients prefer site-built tile, we’re glad to talk through what fits your project. Tell us what look you’re after and we’ll point you to materials that hold up.
FAQs – Vanities, Tile & Fixtures
How much does a new vanity cost in Enterprise?
A standard vanity replacement with cabinet, top, sink and faucet installed typically runs $700 to $2,400 in Enterprise, depending on size, material and fixture brand. Custom-size or double-sink vanities with stone tops sit at the higher end. Call (844) 797-4406 for an exact quote, and the estimate is free.
Can you replace just the tile or just the fixtures without a full remodel?
Yes. We regularly do tile-only work (shower, tub surround or floor) and fixture-only replacements without touching the rest of the bathroom. The site is protected, and the job stays contained to the scope you approve. That said, if the tile is coming out and the fixtures are old, doing both at once usually saves on labor.
Is it cheaper to repair my existing shower tile or replace it?
If the crack or grout problem is surface-level and the waterproofing behind the tile is intact, repair is cheaper. If water has gotten behind the tile and the backing board is soft, replacement is the only fix that lasts because patching won’t stop the moisture. We inspect before recommending, and give you the repair-or-replace math upfront.
Do you offer financing on vanities, tile and fixtures jobs?
Yes. We offer 0% financing for 18 months, plus $1,000 off projects over $10,000 and a free estimate and design consult. Those offers apply to vanities, tile and fixtures work, not just the larger remodels. Call (844) 797-4406 and we’ll walk you through the options before you commit to anything.
Are your technicians background-checked and insured?
Yes, every technician on a Groundwork project is background-checked and arrives in uniform. We’re fully licensed and insured, and all workmanship is covered by the 730-Day Done Right Promise. If it’s not done right, we make it right, and the offer stands in writing.
Why do Enterprise bathrooms fail sooner than other climates?
Two reasons: hard water that leaves mineral deposits on fixtures and works into grout, and the dry, hot cycle that causes tile and caulk to flex and dry rapidly. Proper waterproofing, quality fixtures and correct sealing are how a bathroom avoids the early-failure pattern. Our teams account for both on every job in Enterprise.
Do you answer calls 24/7?
Yes. A live person answers the phone around the clock, seven days a week. No voicemail black holes, no waiting until Monday. Whether you need a quick quote or have a question after hours, we pick up. Call (844) 797-4406.
Can you match my fixtures and grout to the existing bathroom?
In most cases, yes. We can match existing tile, grout and fixture finishes when the original is still available, and if it isn’t, we’ll show you close matches. For partial updates, we aim for seamless blending; for full swaps, we help you start fresh.
Do you handle both the vanity and the tile in one project?
Yes. Vanities, tile and fixtures are handled as one scope under a single point of contact, which matters because the vanity, tile and plumbing interact. One crew, one schedule, one guarantee. Call (844) 797-4406 to get it scoped in one visit.
Do you install prefab or modular bathroom components?
We do. While most Enterprise bathrooms are site-built with tile, we can install prefab or modular bath components (Mighty Buildings and Boxabl are examples in this space) when that’s what a homeowner wants. We’ll talk through the trade-offs vs. tile before you decide.
How do I know a contractor will actually waterproof the shower properly?
Ask to see the waterproofing step in the scope of work before you sign. A real tile job includes backer board and a waterproof membrane, not just thinset over old material. If a bid is priced far below the ranges above, waterproofing is often what got cut. We document the waterproofing step on every job we run.
What if I need the work done quickly before a move or rental listing?
We schedule the fastest realistic window based on materials and scope; vanity-only swaps are often single-visit. Tell us your deadline when you call, and we’ll tell you honestly what’s possible before you commit. Call (844) 797-4406 to check availability.
Talk to Groundwork Construction Co. of Enterprise
Vanities, tile and fixtures are the upgrades that make a bathroom feel new, and they’re worth doing right the first time. At Groundwork Construction Co. of Enterprise, you get upfront pricing, background-checked technicians, a live person on the phone 24/7, and the 730-Day Done Right Promise behind everything we do. Call (844) 797-4406 for a free estimate and design consult, and we’ll get your bathroom in Enterprise looked after. From foundation to finish line, one contractor handles it.
Written by the team at Groundwork Construction Co. of Enterprise, serving Enterprise.


