A Groundwork company - serving Enterprise, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Summerlin, NV

New Detached ADU in Summerlin - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Summerlin, NV: What You’re Actually Signing Up For

A new detached ADU in Summerlin typically runs $45,000 – $130,000 depending on size, foundation conditions and finish level, and the build itself takes four to eight months from the day the lot gets staked to the day you hand over keys. Detached means exactly what it sounds like: a separate structure on your lot with its own foundation, its own utilities and its own address. Call (844) 797-4406 and we’ll walk your lot, check your setbacks and tell you what your specific property can actually support before anyone draws anything.

Call (844) 797-4406

How We Build a Detached ADU in Summerlin, Stage by Stage

A single-story rear room addition with tall windows and a new patio

Most contractors hand you a timeline and then disappear. Here’s what actually happens, in order, so you know what to expect on day one and what you’re signing off on in month five.

Stage 1: Site walk and feasibility (1 – 2 weeks)

We start on your lot, not at a desk. Setbacks, easements, slope, existing utility runs and the location of your mature desert trees all get measured before a single line is drawn. You’ll decide the footprint and where the structure sits relative to your main house, your pool and your views. This is also where caliche shows up as a real number rather than a surprise.

Stage 2: Design, HOA submission and permits (6 – 12 weeks)

This is the slow stage in Summerlin, and it’s slow for a reason. Summerlin sits inside a master-planned community, so your detached ADU has to clear architectural review with the community association before Clark County will finalize the permit. Roof pitch, wall color, exterior material and lot coverage all get judged against the design guidelines. We prepare the submittal package, respond to review comments and pull the county permit. You decide the exterior palette and roofline here, because those choices are the ones that get reviewed.

Stage 3: Site prep, excavation and foundation (2 – 4 weeks)

The lot gets cleared, graded for drainage and trenched for water, sewer, gas and electrical. On the west side of the valley, trenching is where schedules slip: caliche is common in the soil out here and it stops a trencher cold. We budget rock-breaking equipment for that from the start rather than discovering it on day three. Then comes the slab or stem-wall foundation and the first county inspection.

Stage 4: Framing, envelope and rough-ins (6 – 10 weeks)

Wood framing goes up, the roof gets dried in, and stucco, windows and doors follow. Plumbing, electrical and HVAC rough-ins get inspected before anything closes up. Summerlin summers hit 105 – 115°F routinely, so concrete pours get scheduled at dawn with shade and ice on hand, and stucco and roofing crews work dawn shifts through July and August. You’ll pick your window package and your exterior door here.

Stage 5: Finishes, final inspections and handover (6 – 10 weeks)

Insulation, drywall, cabinets, countertops, flooring, fixtures and paint, then mechanical, electrical, plumbing and building finals. You’ll be choosing interior finishes during the rough-in stage, not at the end, so nothing holds up the schedule. Final walkthrough, punch list, keys. Then a 730-Day Done Right Promise sits behind the whole thing.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Detached ADU

Detached ADUs live or die on the decisions made before framing, so here are the ones that matter most, with the honest trade-offs.

  • Footprint size: A 500 – 700 sq ft one-bedroom keeps you in the low end of the range and covers a rental or aging-parent scenario. A 900 – 1,200 sq ft two-bedroom pushes toward the top. Bigger means more foundation, more roof, more mechanical, and a longer county review.
  • Foundation type: A slab-on-grade is the standard here and the most cost-effective. A raised stem-wall or pier-and-beam foundation costs more upfront but handles slope and drainage better on lots with grade changes, which some Summerlin properties have.
  • Roofing: Tile matches the surrounding Summerlin housing stock and holds up to UV and heat, but costs more than asphalt shingle. GAF and CertainTeed shingle systems are a real option when budget matters more than matching the neighborhood. The HOA design guidelines often have an opinion here.
  • Windows and glazing: Desert heat and intense UV make low-E, dual-pane glazing close to mandatory for comfort and energy bills. Cheap single-pane units will bake the interior and fail the comfort test in July.
  • HVAC: A ducted split system is the usual choice. A ductless mini-split saves on ductwork and suits a smaller footprint, but the trade-off is a less even temperature distribution across rooms.
  • Kitchen and bath fixtures: Grohe and comparable brands in the faucet and shower valve range hold up to hard desert water better than builder-grade fixtures, and the price gap is smaller than most people expect.
  • Exterior finish: Stucco is the default and matches the surrounding housing stock. It handles heat well and takes the Summerlin palette requirements without argument.

What a New Detached ADU Costs in Summerlin, NV

A framer checking new wall framing on a home addition

The honest number for a detached ADU in Summerlin is $45,000 – $130,000. Smaller, simpler builds land near the bottom. Larger, two-bedroom structures with premium finishes and difficult excavation land near the top.

Cost driver Typical effect on the total
Footprint size (500 – 700 sq ft vs 900 – 1,200 sq ft) $30,000 – $50,000 swing
Caliche excavation and rock-breaking $3,000 – $10,000 added
Utility trenching distance from the main house $2,000 – $12,000 added
Finish grade (builder-grade vs premium fixtures and flooring) $10,000 – $30,000 swing
HOA-driven exterior changes and design-review revisions $1,000 – $8,000 added

A written estimate from us is line-item: excavation, foundation, framing, envelope, mechanical rough-ins, finishes and permit fees, each with its own number. What usually isn’t included unless it’s spelled out: landscape restoration around the new structure, extending your main electrical service panel if it’s already at capacity, and any HOA fees the community association charges on top of the county permit. Ask for those in writing and get them in writing.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Summerlin Specifically Does to a New Detached ADU

Summerlin is not Clark County with a nice master plan on top. It’s a master-planned community built against the Spring Mountains and Red Rock Canyon, and construction here answers to HOA architectural review and trails and viewshed restrictions layered on top of county permitting. You don’t just pull a permit and build. The community associations and the Summerlin design guidelines shape roof pitches, wall colors, exterior materials and lot coverage, and a detached ADU is exactly the kind of structure that gets a hard look. Plan on an extra review cycle and treat the design guidelines as a real constraint, not paperwork.

The housing stock matters too. Most Summerlin homes are 1990s-to-present, single-family and semi-custom, wood-frame stucco on slab with tile roofs. Lots are frequently small enough that a detached structure sits close to a property line, so setbacks become the first thing we measure. And the desert itself has a say: caliche is common in the west-side soil and it routinely stops trenching and pier drilling, so excavation budgets have to include rock-breaking equipment or the schedule blows up in week three. Drainage and grading plans also have to account for monsoon-season runoff coming off the slopes, because a flash flood does not care how good your roof looks. If your project is part of a full Home Additions & ADU in Summerlin plan that touches the main house too, the sequencing gets more involved but the review logic is the same. We cover the whole community through our Summerlin service area, from The Ridges to Red Rock and out toward the newer western phases.

Serving Summerlin, NV – Our Local Coverage Area

We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Summerlin

A new multi-panel patio door opening a kitchen to the patio

Get a Real Number on Your Detached ADU

We come out to your Summerlin lot, check setbacks, look at the soil, measure the utility run and give you a written line-item estimate for a new detached ADU. No pressure and no vague number that balloons later. If you’re also reworking the main property, homeowners often pair this with Concrete Driveways & Concrete Work in Summerlin or Paver Driveways in Summerlin, and we can scope it under our Home Additions & ADU service in one visit. Call (844) 797-4406 to schedule your free estimate. A live person answers, 24/7.

Written by the team at Groundwork Construction Co.

Why Summerlin Chooses Groundwork Construction Co. of Enterprise

We set the standard for new detached ADU in Summerlin.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Summerlin

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Summerlin Customers Say

Trusted by homeowners across Summerlin and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in niche

More services in Summerlin

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Summerlin?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Summerlin.

(844) 797-4406

Request a Free Estimate in Summerlin

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch