A Groundwork company - serving Enterprise, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Summerlin, NV

Garage Conversion ADU in Summerlin - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Enterprise
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Summerlin: What It Takes and What It Costs

A Garage Conversion ADU in Summerlin usually runs $45,000 – $130,000 and takes 3 to 5 months from the first framing nail to the final inspection, depending on whether you’re adding a bathroom and kitchenette or keeping it to one room and a bath. The work turns an existing garage bay into a legal, rentable or family-ready dwelling: new slab or raised floor, insulated walls, a full MEP rough-in, and a permitted sleeping and living space that clears Clark County. Call (844) 797-4406 to schedule a free on-site estimate.

Call (844) 797-4406

How We Convert a Summerlin Garage into a Permitted ADU

A remodeled family room with new windows and a window seat

Every conversion follows the same spine. What changes is how much of the existing shell we can keep and how much has to be rebuilt to meet current code. Here’s the sequence we run.

Stage 1: Assessment and design (weeks 1 – 2)

We open the garage, check the slab, the header over the door opening, and the depth of the existing footing. In Summerlin’s mostly 1990s-and-newer wood-frame homes, the slab is usually thick enough to build on. We measure ceiling height against the 7-foot minimum for habitable space, and you decide the layout: studio, one-bed, or one-bed-plus-kitchenette. This is also when the HOA architectural review packet starts moving, because nothing gets built until the association signs off on the exterior changes.

Stage 2: Permits and HOA approval (weeks 2 – 6, running in parallel)

Clark County handles the building, electrical, mechanical, and plumbing permits. Your community association handles the architectural review. These are two separate approvals and both have to be in hand before demolition. The association review is often the longer of the two in Summerlin, so we file it first. You’ll need to know the approved exterior door style and color for your village before the packet goes in.

Stage 3: Demolition and rough-in (weeks 6 – 10)

Out comes the garage door and opener, any shelving, and the old slab finish if it’s cracked or too thin. We frame the new walls inside the shell, add the insulation the county requires for a conditioned space, and run electrical, plumbing, and HVAC. This is the stage where a bathroom location decision costs you money: putting the bath against an exterior wall near the main house drain is cheap, and putting it across the room from the drain is not. You pick fixtures here and confirm the heating and cooling approach: a ductless mini-split versus tying into the house system.

Stage 4: Close-up and finishes (weeks 10 – 16)

Drywall, texture, paint, flooring, cabinets, counters, tile, and trim. This is the longest stretch of visible change and the one you’ll walk through most often. Material choices made in stage 1 get installed now, and any change you make mid-stream has a real lead time attached to it, which is why we lock the finish schedule early.

Stage 5: Inspections and punch (weeks 16 – 20)

Final building, electrical, plumbing, and mechanical inspections, plus the smoke and carbon monoxide alarms the county checks before sign-off. We walk the unit with you, build the punch list, and close it out. Your association may want a final exterior look before the job is officially done. The whole unit is covered by our 730-Day Done Right Promise the day we hand over the keys.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

  • Floor system: a raised wood subfloor over the existing slab keeps the concrete and gives you a warmer, level floor, but adds height and cost. Poured or finished slab is cheaper and bulletproof in a garage, but colder underfoot and harder to run plumbing through. Most Summerlin conversions we do use a finished slab in the living area and a raised floor in the bath.
  • HVAC: a ductless mini-split is the common pick for a single-room conversion. It’s efficient, quick to install, and zones the unit off the main house. Tying into the existing system costs less up front but can strain an older air handler. In a Summerlin summer, undersizing this is the mistake that shows up in July.
  • Exterior door and garage-door opening: that big opening becomes a wall with a man-door and windows. Here the HOA picks the style: your village design guidelines specify door color, window trim, and often the stucco finish, so we build to the approved spec rather than a generic one.
  • Kitchenette versus full kitchen: a sink, mini-fridge, and microwave drawer runs far less than a full range-and-vent setup and often clears the county’s ADU rules for a junior unit.
  • Windows: this is the one place to spend on glass. Impact-rated windows are worth considering on the west side, and the grade you pick drives both the light and the cooling load. We install Andersen and Pella on the units where the homeowner wants a name they recognize.
  • Insulation and roof: the existing attic over the garage is often under-insulated for a living space. Upgrading it is quiet money well spent given how hard the desert sun hits a west-facing roof.

What a Garage Conversion ADU Costs in Summerlin, NV

A framer checking new wall framing on a home addition

The range for this job in Summerlin is $45,000 – $130,000. A straightforward one-room conversion with a half-bath lands near the bottom. A full one-bedroom with a kitchenette, upgraded windows, and a mini-split lands in the middle. A high-end unit with a full kitchen, premium finishes, and structural work to open the space pushes the top.

Four things move the number most:

  • Bathroom and kitchen placement. Distance from the main drain line and the panel is the single biggest cost swing. A bath against the house wall is cheap; one across the slab means cutting concrete and re-routing.
  • Electrical service. If your panel has headroom, adding a subpanel is modest. If it’s full or undersized, a service upgrade adds real cost.
  • Existing condition. A clean, dry slab and a solid header keep costs down. Cracked slabs, water damage, or a sagging header means structural work.
  • Material grade. Flooring, cabinets, counters, and fixtures scale the price quickly. The frame and systems cost roughly the same either way; the finishes are where you choose your ceiling.
  • Permit and HOA scope. A full ADU with a kitchen needs more inspection stages than a single-room conversion. We pull the permits and pass the inspections as part of the job.

A written estimate from us is line-itemed and fixed: the number you see is the number you pay. If a hidden condition turns up after demo, we stop and quote it before touching it. No change orders from surprise. We also offer 0% financing for 18 months and $1,000 off projects over $10,000.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Summerlin Homes Specifically Do to This Job

Summerlin is a master-planned community, and that changes the job before a single permit is filed. Construction here is governed by HOA architectural review and design guidelines layered on top of Clark County permitting, which means a garage conversion isn’t just a county sign-off. You also have to clear the community association, and the association has opinions about door styles, colors, rooflines, and what the facade looks like from the street. We build to the approved spec, not a generic one, and we handle the review packet. That’s the difference between a clean approval and a violation notice six weeks in.

The housing stock helps. Most Summerlin homes we work on are 1990s-to-present wood-frame stucco on slab with tile roofs, so the garage shells are solid and the conversions are mostly interior work. The slab is the exception: west-side soil carries caliche, that cement-hard calcium layer, and if trenching for the new drain hits it, the crew breaks rock. We budget for that on the estimate rather than surprise you. The desert climate matters too: crews schedule early-morning pours and slab work because the summer heat hits 105 – 115°F, and the HVAC choice has to match a west-facing garage that bakes all afternoon.

Serving Summerlin, NV – Our Local Coverage Area

We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Summerlin

A new black aluminum pool fence with a gate

Get a Free Estimate for Your Summerlin Garage Conversion

If you’re converting a garage into a rentable unit, a space for family, or a home office that finally has a door, start with a free on-site estimate. We’ll measure the garage, check the slab and header, confirm what your HOA will approve, and give you a written line-item price before any work begins. Call (844) 797-4406 and a live person will pick up. We’ll set a time that works for you.

Written by the team at Groundwork Construction Co. of Enterprise.

Why Summerlin Chooses Groundwork Construction Co. of Enterprise

We set the standard for garage conversion ADU in Summerlin.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Summerlin

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Summerlin Customers Say

Trusted by homeowners across Summerlin and surrounding areas.

★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valley

More services in Summerlin

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Enterprise

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Enterprise team

A local vetted partner works across Enterprise and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Summerlin?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Summerlin.

(844) 797-4406

Request a Free Estimate in Summerlin

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch